Skip to main content

Tankman

Major VersionM

by Jason Wiseman

    • Install Washer 80-119 in Nozzle Carrier 80-117.

    • Apply anti-seize to all threads.

    • Install Horizontal Shaft 80-113 in Washer 80-119.

    • Apply anti-seize to all threads.

    • Arrange (2) J6-238 Thrust Washers on either side of (1) PTFE Washer 80-116 and install on Horizontal Shaft 80-113 .

    • Apply anti-seize to all threads.

    • Turn 44 Tooth Gear 80-114 to Nozzle Carrier 80-117 .

    • Apply anti-seize to all threads.

    • Torque 45 Tooth Gear 80-111 to 70 Ft-lbs using Spanner Wrench 80-124

    • Apply anti-seize to all threads.

    • Arrange remaining (2) 80-119 Washers on either side of Washer 80-116 and install in 45 Tooth Gear 80-111.

    • Apply anti-seize to all threads.

    • Turn Lower Body Cap 80-110 onto 45 Tooth Gear 80-111 .

    • Keep Gear 80-111 facing teeth down while turning into Lower Body Cap 80-110 to keep washers in place.

    • Torque 45 Tooth Gear 80-111 70 Ft-lbs using Spanner Wrench 80-124 .

    • Apply anti-seize to all threads.

    • Turn Vertical Shaft 80-102 onto Elbow 80-112 .

    • Tighten to snug using a bar.

    • Use a bar made from a soft material (brass or aluminum) to avoid part damage.

    • Apply anti-seize to all threads.

    • Insert a bar through Nozzle Carrier 80-117 and Horizontal Shaft 80-113 and turn the assembly to Elbow 80-112. Tighten to snug.

    • Use a bar made from a softer material (brass or aluminum) to avoid damage.

    • Apply anti-seize to all threads.

    • Install assembled Lower Body Cap onto Vertical Shaft 80-102 .

    • Slowly rotate Nozzle Carrier to ensure proper gear alignment.

    • Apply anti-seize to all threads.

    • Turn Right Handed Impeller 80-109-SS onto Vertical Shaft 80-102 .

    • Be sure to orient impeller as seen in video.

    • Gently tap fin with a rubber mallet to tighten.

    • Apply anti-seize to all threads.

    • Install Inlet Disc 80-106 inside Outer Body 80-107 with bearing recess facing up.

    • Turn Outer Body 80-107 to Lower Body Cap 80-110.

    • Apply anti-seize to all threads.

    • Install Vertical Shaft Bushing 80-108 onto 80-102 until it rests in the center bore of Inlet Disc 80-106.

    • Arrange (2) yellow J6-239 Washers on either side of (1) white 80-105 Washer.

    • Install washers in the center recess of Inlet Disc 80-106.

    • Apply anti-seize to all threads.

    • Turn Vertical Shaft Cap 80-104 onto Vertical Shaft 80-102 and finger tighten.

    • Install Split Lock Washer 20-14-1 on Vertical Shaft 80-102 and turn Nut 15-23-1 . Torque Nut 15-23-1 to 20 Ft-lbs.

    • Do not over tighten Nut 15-23-1.

    • Apply anti-seize to all threads.

    • Turn Inlet Cap 80-101 onto the Outer Body and torque to 60 ft-lbs. This will also tighten the Outer Body to the Lower Body Cap.

    • Apply anti-seize to all threads.

    • Turn Nozzle J6-115 to 60 ft-lbs into the 80-123 Nozzle Extensions.

    • Apply anti-seize to all threads.

    • Install the 74-324 set screws into the (2) locations on the 80-112 Elbow. Tighten to snug.

    • Apply anti-seize to all threads.

    • Turn Nozzle Assemblies into the Nozzle Carrier and torque to < 60 Ft-lbs.

    • Apply anti-seize to all threads.

  1. The  Tankman assembly is complete!
    • The Tankman assembly is complete!

Finish Line

2 other people completed this guide.

Daniel Weeks

Member since: 07/27/2016

4,153 Reputation

10 Guides authored

2 Comments

I was unable to view BOM or exploded parts list as it has 404 error Forbidden

Mike - Reply

I have reviewed this manual now and it looks good. Do we have other manuals I can review yet? I assume all the flow curves and exploded view of the parts will be included, or be available as separate pieces. Let me know when you can.

Thanks,

Mike

Mike - Reply

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 4

Past 30 Days: 9

All Time: 838