Tools
-
-
Gather all components. Click here for exploded view and parts list.
-
-
-
Install (2) Washers J6-239 and (1) Washer 80-105 to Inlet Disc 80-106.
-
-
Install Vertical Shaft Cap 80-104 to Vertical Shaft 40-102 until finger tight.
-
Install Split Lock Washer 20-14-1 and Nut 15-23-1 to Vertical Shaft 40-102. Torque Nut 15-23-1 to 20 Ft-lbs.
-
DO NOT over tighten Nut 15-23-1.
-
Apply anti-seize to all threads.
-
-
-
Machine is now complete
-
Cancel: I did not complete this guide.
One other person completed this guide.